36.9881° N, 76.1652° W
36.9881° N, 76.1652° WLast 24 h track
Voyage
- Speed
- 5.3 kn
- Course
- 119°
- Position
- 36.9881° N, 76.1652° W
- Last report
- 1 Nov 2026, 20:24 UTC
- Nearest port
- Lynnhaven Roads9.8 km NW of the port
Particulars
- MMSI
- 368217260
- Call sign
- WDM5580
- Flag
- 🇺🇸 United States
- Type
- Sailing vesselAIS type 36
- Length
- 14 m
- Beam
- 4 m
Not broadcast: destination, IMO number and draught.
About CRITICAL PATH
CRITICAL PATH (MMSI 368217260) is a sailing vessel registered in the United States. It is 14 m long and 4 m wide. Its most recent AIS position, received on 1 Nov 2026 at 20:24 UTC, placed it 9.8 km NW of Lynnhaven Roads, United States. It was moving at 5.3 knots on a course of 119°.
Frequently asked questions
Where is CRITICAL PATH now?
CRITICAL PATH was last reported 9.8 km NW of Lynnhaven Roads, United States on 1 Nov 2026 at 20:24 UTC. It was moving at 5.3 knots on a course of 119°.
What type of ship is CRITICAL PATH?
CRITICAL PATH is a sailing vessel. It is 14 m long and 4 m wide.
What is the MMSI number of CRITICAL PATH?
The MMSI of CRITICAL PATH is 368217260. Its call sign is WDM5580.
What flag does CRITICAL PATH fly?
CRITICAL PATH sails under the flag of the United States (US).
Vessels nearby
Other ships reported close to CRITICAL PATH in the last 24 hours.
Other vessels named CRITICAL PATH
Ship names are not unique — check the MMSI or IMO to be sure you have the right one.
Similar sailing vessels
Active sailing vessels of a similar size (10–18 m).
Get alerts when CRITICAL PATH arrives in port
Follow CRITICAL PATH on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.
