CRITICAL PATH

MMSI 368437760Call sign WDQ5787

In the port of Port Everglades, United States

Live ·

26.1075° N, 80.1245° W

26.1075° N, 80.1245° W

Voyage

Speed
0.0 kn
Heading
87°
Position
26.1075° N, 80.1245° W
Last report
7 Nov 2026, 07:18 UTC
Nearest port
Port EvergladesIn port

Particulars

MMSI
368437760
Call sign
WDQ5787
Type
Pleasure craftAIS type 37
Length
21 m
Beam
5 m

Not broadcast: destination, IMO number and draught.

About CRITICAL PATH

CRITICAL PATH (MMSI 368437760) is a pleasure craft registered in the United States. It is 21 m long and 5 m wide. Its most recent AIS position, received on 7 Nov 2026 at 07:18 UTC, placed it in the port of Port Everglades, United States.

Frequently asked questions

Where is CRITICAL PATH now?

CRITICAL PATH was last reported in the port of Port Everglades, United States on 7 Nov 2026 at 07:18 UTC.

What type of ship is CRITICAL PATH?

CRITICAL PATH is a pleasure craft. It is 21 m long and 5 m wide.

What is the MMSI number of CRITICAL PATH?

The MMSI of CRITICAL PATH is 368437760. Its call sign is WDQ5787.

What flag does CRITICAL PATH fly?

CRITICAL PATH sails under the flag of the United States (US).

Vessels nearby

Other ships reported close to CRITICAL PATH in the last 24 hours.

Show 6 more

Other vessels named CRITICAL PATH

Ship names are not unique — check the MMSI or IMO to be sure you have the right one.

Similar yachts & pleasure craft

Active yachts & pleasure craft of a similar size (15–27 m).

All yachts & pleasure craft

Get alerts when CRITICAL PATH arrives in port

Follow CRITICAL PATH on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.

Track CRITICAL PATH live — free