CHANGE ORDER

MMSI 232065011Call sign MTCY5

In the port of Lippenwoude, Netherlands

Last seen

52.9699° N, 5.6227° E

52.9699° N, 5.6227° E

Speed0.1kn
DestinationCLASS B

Voyage

Destination
CLASS B
Speed
0.1 kn
Course
306°
Position
52.9699° N, 5.6227° E
Last report
6 Nov 2026, 16:50 UTC
Nearest port
LippenwoudeIn port

Particulars

MMSI
232065011
Call sign
MTCY5
Type
Pleasure craftAIS type 37
Length
12 m
Beam
4 m

Not broadcast: ETA, IMO number and draught.

About CHANGE ORDER

CHANGE ORDER (MMSI 232065011) is a pleasure craft registered in the United Kingdom. It is 12 m long and 4 m wide. Its most recent AIS position, received on 6 Nov 2026 at 16:50 UTC, placed it in the port of Lippenwoude, Netherlands. The crew reported CLASS B as the destination.

Frequently asked questions

Where is CHANGE ORDER now?

CHANGE ORDER was last reported in the port of Lippenwoude, Netherlands on 6 Nov 2026 at 16:50 UTC.

What type of ship is CHANGE ORDER?

CHANGE ORDER is a pleasure craft. It is 12 m long and 4 m wide.

What is the MMSI number of CHANGE ORDER?

The MMSI of CHANGE ORDER is 232065011. Its call sign is MTCY5.

What flag does CHANGE ORDER fly?

CHANGE ORDER sails under the flag of the United Kingdom (GB).

Where is CHANGE ORDER going?

CHANGE ORDER reported its destination as CLASS B.

Vessels nearby

Other ships reported close to CHANGE ORDER in the last 24 hours.

Show 6 more

Other vessels named CHANGE ORDER

Ship names are not unique — check the MMSI or IMO to be sure you have the right one.

Similar yachts & pleasure craft

Active yachts & pleasure craft of a similar size (8–16 m).

All yachts & pleasure craft

More yachts & pleasure craft in the directory

The next yachts & pleasure craft with an IMO number after CHANGE ORDER, A–Z.

All yachts & pleasure craft

Get an alert when CHANGE ORDER reaches CLASS B

Follow CHANGE ORDER on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.

Track CHANGE ORDER live — free