38.9627° N, 76.4834° W
38.9627° N, 76.4834° W
Voyage
- Speed
- 0.0 kn
- Course
- 328°
- Position
- 38.9627° N, 76.4834° W
- Last report
- 31 Oct 2026, 23:06 UTC
- Nearest port
- Harwood17 km NE of the port
Particulars
- MMSI
- 338163602
- Flag
- 🇺🇸 United States
- Type
- Pleasure craftAIS type 37
- Length
- 13 m
- Beam
- 4 m
Not broadcast: destination, call sign, IMO number and draught.
About CHANGE ORDER
CHANGE ORDER (MMSI 338163602) is a pleasure craft registered in the United States. It is 13 m long and 4 m wide. Its most recent AIS position, received on 31 Oct 2026 at 23:06 UTC, placed it 17 km NE of Harwood, United States.
Frequently asked questions
Where is CHANGE ORDER now?
CHANGE ORDER was last reported 17 km NE of Harwood, United States on 31 Oct 2026 at 23:06 UTC.
What type of ship is CHANGE ORDER?
CHANGE ORDER is a pleasure craft. It is 13 m long and 4 m wide.
What is the MMSI number of CHANGE ORDER?
The MMSI of CHANGE ORDER is 338163602.
What flag does CHANGE ORDER fly?
CHANGE ORDER sails under the flag of the United States (US).
Vessels nearby
Other ships reported close to CHANGE ORDER in the last 24 hours.
Other vessels named CHANGE ORDER
Ship names are not unique — check the MMSI or IMO to be sure you have the right one.
Similar yachts & pleasure craft
Active yachts & pleasure craft of a similar size (9–17 m).
Get alerts when CHANGE ORDER arrives in port
Follow CHANGE ORDER on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.
