41.7527° N, 70.7094° W
41.7527° N, 70.7094° W
Voyage
- Destination
- CLASS B
- Speed
- 0.0 kn
- Position
- 41.7527° N, 70.7094° W
- Last report
- 3 Nov 2026, 20:04 UTC
- Nearest port
- Cataumet12 km NW of the port
Particulars
- MMSI
- 338337901
- Flag
- 🇺🇸 United States
- Type
- Pleasure craftAIS type 37
- Length
- 14 m
- Beam
- 4 m
Not broadcast: ETA, call sign, IMO number and draught.
About CHANGE ORDER
CHANGE ORDER (MMSI 338337901) is a pleasure craft registered in the United States. It is 14 m long and 4 m wide. Its most recent AIS position, received on 3 Nov 2026 at 20:04 UTC, placed it 12 km NW of Cataumet, United States. The crew reported CLASS B as the destination.
Frequently asked questions
Where is CHANGE ORDER now?
CHANGE ORDER was last reported 12 km NW of Cataumet, United States on 3 Nov 2026 at 20:04 UTC.
What type of ship is CHANGE ORDER?
CHANGE ORDER is a pleasure craft. It is 14 m long and 4 m wide.
What is the MMSI number of CHANGE ORDER?
The MMSI of CHANGE ORDER is 338337901.
What flag does CHANGE ORDER fly?
CHANGE ORDER sails under the flag of the United States (US).
Where is CHANGE ORDER going?
CHANGE ORDER reported its destination as CLASS B.
Vessels nearby
Other ships reported close to CHANGE ORDER in the last 24 hours.
Other vessels named CHANGE ORDER
Ship names are not unique — check the MMSI or IMO to be sure you have the right one.
Similar yachts & pleasure craft
Active yachts & pleasure craft of a similar size (10–18 m).
Get an alert when CHANGE ORDER reaches CLASS B
Follow CHANGE ORDER on the live map with a free account. Alerts on port calls, destination changes and AIS silence come with a fleet on any plan from €9.99/month.
